Your search results for "MB 2K"

  Show all filters

View:

10 Reference(s) found

Reference

Category

Description

Category

Building Waterpoofing and Refurbishment, Facade Protection and Refurbishment, Coating for Windows and Wood Elements

Description

The buildings of "New Holland" have been restored several times over the years and have been repeatedly supplemented with new buildings and extensions. All buildings were damaged inside as well as on the facade and roof. The brick facades in particular, which were heavily soaked through, posed a major problem. In addition, damage to the masonry and the cladding of the plinths was detected. During the restoration of the brick masonry, the varying condition as well as the heterogeneous nature proved to be a particular challenge. There was also high salt content, which could be damaging to the building and therefore had to be reduced. Finally, the aim was to achieve the most harmonious possible colour matching of the stone surfaces.

Category

Concrete Protection and Repairs, Building Waterpoofing and Refurbishment

Description

The pool is permanently exposed to positive and negative water pollution. It was therefore important that an expansion zone remains in the middle of the joint seal, which allows the structure to work and provides an optimal surface. The joints should still be reliably sealed. Both the crack repair and the concrete repair were carried out in accordance with the classic procedure in accordance with the repair guidelines, in which cracks are closed by injecting epoxy or polyurethane resin using a drill packer. The concrete surfaces in particular had to be protected against chemical attack, especially against the high ammonium pollution from the connected meat industry.

Category

Facade Protection and Refurbishment, Building Waterpoofing and Refurbishment, Concrete Protection and Repairs

Description

The lake itself had been drained since 2014 but had significant cracking and deterioration on the slab joints. In order to have a succesful restoration, the lake needed to become watertight again. The solution was available using Remmers MB2K waterproofing in conjunction with Waterstop B240 banding. WHY? The existing joint filler material within the lake was bituminous in nature. MB2K adheres excellently to both new and old bitumen coatings, without the need to abrade or mechanically prepare them, a critical advantage in this instance. Removal or the existing damaged fillers would have been a time consuming and costly excercise. Having waterproofed the lake bed and walls, extensive restoration then took place on the stone staircases and planters around the site. Colour matched restoration mortars and Funcosil hydrophobic treatments were used extensively.

Category

Facade Protection and Refurbishment

Description

On the façade surfaces of Kaispeicher A, there was a lot of efflorescence and lime aging, both signs of penetrating moisture. The damage patterns indicated a lack of frost resistance as well as no protection against driving rain. The listed façade required extensive frost and moisture protection, but was not allowed to undergo any visual changes.

Reference

C&D Foods, Longford

Longford

Category

Floor Coatings

Description

Remmers Crete SL was applied in combination with Remmers PUR Color Top 2KM seal coat to provide a colour stable finish and a subsequent seal coat of Remmers PUR Aqua Top 2KM SG, with the inclusion of a polymer bead to provide an R11 level of slip resistance with a silk gloss floor finish. The system was installed by specialist flooring contractor Larsen Contracts who worked closely with the main contractor, Gem Construction to allow the installation of the floor whilst other fitting out activities were also being carried out, optimising the overall program.This carefully designed system is ideally suited to areas subjected to medium to heavy duty use for industrial floors within food processing facilities.

Category

Facade Protection and Refurbishment, Building Waterpoofing and Refurbishment

Description

The restoration of the building, which is over one hundred years old, was a complex task. The facade first had to be cleaned with special product due to the high degree of contamination with heavy efflorescence and sintering, The damaged joints were then repaired. The white natural stone elements of the façade were desalinated with compresses and then re-profiled and supplemented. This was followed by stone consolidation and hydrophobing. A mineral sealing was applied in the base area, which was finished with a new layer of plaster. Therefore protecting the building from further moisture ingress.

Reference

Logistics Hall, Aschaffenburg, Germany

Aschaffenburg

Category

Floor Coatings

Description

The asphalt walkways showed great damage due to decades of stress. Numerous penetrations, caused by heavy shelving fixtures and broken wall panels, led to incorrect positions The flooring was also cracked in large areas and had defective joints.

Category

Floor Coatings

Description

The floor in the Ratiopharm-Arena was designed with a coloured PU-coating with a flake scattering. Despite the transparent sealing, UV stability had to be guaranteed. As there is room for up to 9000 people in the arena, the floor is exposed to high mechanical stress. This is also the reason for the non-slip surface which must be present to ensure the safety of the visitors.

Reference

St Columb's Cathedral, Londonderry

Londonderry

Category

Facade Protection and Refurbishment

Description

For repair / strengthening and protection of stonework, Mullarkey Pederson Architects chose the following system: RM, Funcosil KSE 300 and Funcosil SL.

Reference

BASF, Little Island

Cork

Category

Building Waterpoofing and Refurbishment

Description

The joints in the concrete sections are subject to continuous movement and so a waterproof and crack bridging system was required. Over 100m of Remmers Flexible bandage B200 was fixed using Epoxy MT 100. The system was over coated in part with Remmers MB 2K.